Case study

Controlled repair. Traceable closeout.

A route from condition assessment through repair, testing and project handover.

Return project units to service

The scope required offshore containers to be assessed, repaired and prepared for project use with appropriate inspection and documentation controls.

OSS coordinated structural work, surface preparation, hardware repair, testing interfaces and closeout records.

1

Assess

Record condition, defects and repair requirements.

2

Repair

Complete controlled steel, hardware and coating work.

3

Verify

Coordinate testing and final documentation.

Call OSSEnquire